Run of lintian-fixes for rust-termcolor

Try this locally (using the lintian-brush package):

debcheckout rust-termcolor
cd rust-termcolor
lintian-brush

Merge these changes:

git pull https://janitor.debian.net/git/rust-termcolor lintian-fixes/main

Summary

Diff

diff --git a/src/termcolor/debian/changelog b/src/termcolor/debian/changelog
index e8da0b44..5415b530 100644
--- a/src/termcolor/debian/changelog
+++ b/src/termcolor/debian/changelog
@@ -1,3 +1,9 @@
+rust-termcolor (1.1.0-2) UNRELEASED; urgency=medium
+
+  * Set upstream metadata fields: Bug-Database, Bug-Submit.
+
+ -- Debian Janitor <janitor@jelmer.uk>  Thu, 11 Mar 2021 02:35:18 -0000
+
 rust-termcolor (1.1.0-1) unstable; urgency=medium
 
   * Package termcolor 1.1.0 from crates.io using debcargo 2.4.0
diff --git a/src/termcolor/debian/upstream/metadata b/src/termcolor/debian/upstream/metadata
new file mode 100644
index 00000000..05bfff43
--- /dev/null
+++ b/src/termcolor/debian/upstream/metadata
@@ -0,0 +1,3 @@
+---
+Bug-Database: https://github.com/BurntSushi/ripgrep/issues
+Bug-Submit: https://github.com/BurntSushi/ripgrep/issues/new

Publish History

  • 2021-05-12T12:51: Failed to create merge proposal: missing-build-diff-control (Missing binary diff; requesting control run.)
  • 2021-04-01T12:11: Failed to create merge proposal: merge-conflict (merge would conflict (upstream changes?))
  • 2021-03-15T04:34: Failed to create merge proposal: nothing-to-do (not enough changes for a new merge proposal)
  • 2021-03-15T04:34: Failed to create merge proposal: nothing-to-do (not enough changes for a new merge proposal)
  • 2021-03-15T04:34: Failed to create merge proposal: nothing-to-do (not enough changes for a new merge proposal)
  • 2021-03-14T22:18: Failed to create merge proposal: nothing-to-do (not enough changes for a new merge proposal)
  • 2021-03-14T13:45: Failed to create merge proposal: missing-build-diff-control (Missing binary diff; requesting control run.)
  • 2021-03-14T10:21: Failed to create merge proposal: missing-build-diff-control (Missing binary diff; requesting control run.)
  • 2021-03-14T07:29: Failed to create merge proposal: missing-build-diff-control (Missing binary diff; requesting control run.)
  • 2021-03-14T03:48: Failed to create merge proposal: missing-build-diff-control (Missing binary diff; requesting control run.)

Full worker log Full build log